Abstract:Using similar thought as Marmousi model for demonstration of seismic approach and taking structural configuration, formed by multi-period tectonic movement and 6 typical structural models in Jiyang fault depression basin as studied objects, the paper compressed the typical geologic feature of Shengli Oilfield into one model, i.e. complex geologic model in continental fault depression basin, simply called "Shengli Oilfield typical model". The paper expounded the concrete model-building process and method, i.e. first to create structural models and then to build up stratigraphic and lithologic models. The paper also introduced the forward simulation of Shenli Oilfield typical model and application of their data volume to study prestack depth migration and design of geometry. The application effects showed the method has good application prospect.